1. For certification entrustment and application, the materials shall be filed in paper, signed and stamped with the company's seal in duplicate p>
2. The number of finished products of each product is five. The test shall be completed within 30 working days after receiving the test samples p>
3. The factory audit can be carried out only after the initial factory audit and the test pass. The time is about three weeks according to the CQC plan, which is not required by the old factory p>
4. The 3C certification certificate can be obtained only after the evaluation and approval of certification results, sample test and factory audit are passed p>
5. Sign application and use, make CCC sign CAD drawings and position drawings on products, and report to the sign center for review p>
6. Supervision after obtaining the certificate. CQC will supervise and audit the certified factory once a year to evaluate the production capacity p>